X

XLE Fracturing Analyzer & Job Simulator

Multiphase Hydraulics • P_max Governor • Proppant Ramp • Fracture Growth

Surface Treating Pressure
-- MPa
P_max Limit: -- MPa
Actual Slurry Rate
-- m³/min
Target: -- m³/min
Total Proppant Placed
-- tonnes
Slurry: -- kg/m³
Avg Perforation Friction (ΔP)
-- MPa
Efficiency: --%
Hydraulic Power
-- kW
Heel/Toe Flow: --
⏱️ Frac Job Timeline: Pad Stage (0.0 min)
0.0 min
📊 Real-Time Frac Job Strip Chart
Surface Press (P_surf)
Bottomhole (BHTP)
Actual Rate
Proppant Loading
Hole Diam (d)
P_max Limit
🗺️ Real-Time Fracture Geometry Growth Map (Plan View)
Wellbore (Heel ➔ Toe)
Fluid Tip (x_f)
Proppant Core
Perforation Jet Origin
Cluster Flow & Proppant Mass Partitioning (Heel to Toe)
Fluid Rate (%)
Proppant Mass (%)
Eroded Diam (mm)
Initial d₀ (mm)
Cluster Completion, Proppant Mass & Fracture Dimensions Live Cumulative Proppant & Half-Length Growth
Cluster Holes Diam (mm) Δd (mm) Total Sand (tonnes) Sand / Hole (kg) Flow (m³/min) Flow % Frac x_f (m) Frac Width (mm) Perf Jet (m/s) Perf ΔP (MPa)